References

Renewal of the DN 600 water main, Ovčín, Slivenec, Prague 5
Pomocí technologie Berstlining

Renewal of the Lhenice transmission pipeline

Construction of utility networks – Panattoni Park Teplice South

Water mains Dírná, Závsí, Záříčí, and Nová Ves

Sewerage of the village Okna and construction of WWTP
Construction of pressure sewer system and WWTP

Postoloprty, Březno bridge crossing – reconstruction of the transmission pipeline
Replacement of water pipe on a bridge structure
Reconstruction of the water supply system in the Unipetrol complex
ETE thermal feeder – České Budějovice – completion
Pipe jacking from OCR DN 1000, total length 247 m, using mining method
Postoloprty, Březno bridge crossing – reconstruction of the transmission pipeline
Ostrov nad Ohří – sewer system construction
Construction of a sewer system at Ostrov nad Ohří prison using HDD technology
Reconstruction of wastewater pumping station E1930
Reconstruction of a pumping station at Spolana Neratovice