References

Renewal of the DN 600 water main, Ovčín, Slivenec, Prague 5

Pomocí technologie Berstlining

Renewal of the Lhenice transmission pipeline

Construction of utility networks – Panattoni Park Teplice South

Water mains Dírná, Závsí, Záříčí, and Nová Ves

Sewerage of the village Okna and construction of WWTP

Construction of pressure sewer system and WWTP

Postoloprty, Březno bridge crossing – reconstruction of the transmission pipeline

Replacement of water pipe on a bridge structure

Reconstruction of the water supply system in the Unipetrol complex

ETE thermal feeder – České Budějovice – completion

Pipe jacking from OCR DN 1000, total length 247 m, using mining method

Postoloprty, Březno bridge crossing – reconstruction of the transmission pipeline

Ostrov nad Ohří – sewer system construction

Construction of a sewer system at Ostrov nad Ohří prison using HDD technology

Reconstruction of wastewater pumping station E1930

Reconstruction of a pumping station at Spolana Neratovice

Reconstruction of the sewer system in the Mondi company area